In a multi-cavity injection mold, molten plastic must reach several cavities through a shared delivery system. The channels in that system influence filling pressure, material consumption, cycle time and consistency between parts. They deserve attention during tooling review, even though they usually do not remain on the finished product.
Runners carry melt toward the cavities. Sub-runners are branches of that distribution network. Understanding how they connect to the sprue and gates helps buyers ask more precise questions about a mold quotation and helps engineers identify where an apparent molding problem may actually begin.

1. Define the melt path before comparing designs

In a typical branched cold-runner system, the flow path is:
Machine nozzle → sprue → main runner → branch runner or sub-runner → gate → cavity.
The sprue is the inlet passage receiving melt from the nozzle in this arrangement. The main runner distributes melt toward branches. A sub-runner , also called a secondary or branch runner, feeds a smaller section of the network. Further branches may exist in a higher-cavity-count tool.
The gate is the local entry into the cavity. Its dimensions and form affect filling, packing, separation and the mark left on the part. It is not simply another name for the entire branch runner. Protolabs defines the runner as the channel carrying resin from the injection point to the gate.
“Sub-runner” is not used identically by every toolmaker. In this article it means a branch channel downstream of a main runner. Confirm the naming on the actual mold drawing, especially when discussing a hybrid hot-and-cold system. Not every tool has all the elements in the sequence above: a single-cavity direct-sprue design or direct hot-runner gating can use a different path.

2. What main runners and sub-runners do

The main runner receives flow for multiple downstream cavities. A branch carries only the flow required by its downstream section. As a result, the network should be sized around flow demand and allowable pressure loss rather than copied from a standard diameter without analysis.
Suppose a four-cavity tool makes four identical parts. A symmetric H-shaped layout can split the incoming melt into two paths and then into four cavity feeds. The branches guide melt toward each gate, while the gates control the final entry into the cavities.
This layout is a useful starting concept, not proof that all four parts will fill identically. Melt temperature, shear history, gate condition and local cavity resistance also matter.

A cold-runner shot makes the distribution network visible after the plastic has solidified.

3. Cold runners and hot runners manage heat differently

In a cold-runner mold, the feed channels are cooled with the tool and the plastic in them solidifies during the cycle. The runner and sprue are removed from the mold, either attached to the parts or separated through the mold's operating sequence. This creates additional handling and material to manage.
In a hot-runner system, heated passages and nozzles keep the distribution melt within a controlled processing range while the parts cool. Depending on the architecture, the system can feed gates directly or supply shorter cold-runner branches. A direct hot-runner arrangement can avoid ejecting a conventional cold-runner network each shot, but startup, purging and rejected parts still create material losses. Husky describes hot-runner solutions in terms of controlled melt delivery, part quality and material efficiency.
Factor Cold-runner approach Hot-runner approach
Feed-system material Solidifies and is removed each cycle Remains molten in heated passages during normal operation
Tool investment Often simpler and lower initially Usually adds heating, controls and system cost
Material handling Runner separation and an approved reuse or disposal route Less conventional runner material in direct-gated designs; purge losses remain
Cycle constraint A thick runner may govern cooling or removal Part cooling and other operations may still govern
Maintenance Runner release, gates and mold condition Also includes heaters, thermocouples, seals and nozzle condition

Selection depends on resin, volume, part requirements, color changes and maintenance support. A hot runner is not automatically the lowest-cost option for every project, and a cold runner is not automatically unsuitable for demanding components.

Hot-runner design adds thermal control and maintenance considerations to melt distribution.

4. Balance flow rather than just drawing equal lines

A geometrically balanced layout gives equivalent paths to identical cavities. A rheologically balanced design also considers how the flowing material behaves along those paths. Even an apparently symmetric network can deliver different melt conditions to different branches.
An unbalanced tool may show one cavity filling early while another remains incomplete. Increasing overall pressure may overpack the early cavity instead of correcting the cause. Autodesk's runner-balance guidance targets comparable pressure drops and simultaneous filling while controlling runner volume and shear heating.
Family molds need particular care because different parts have different volumes and filling resistance. Equal-length runners do not make different cavities behave alike. Model the actual parts, approved resin and intended process rather than assuming that visual symmetry is sufficient.

5. Choose runner dimensions around the whole process

A runner that is too restrictive can increase pressure loss, shear heating and the risk of incomplete filling. Enlarging it can reduce resistance, but a larger cold runner adds material per shot and may take longer to solidify. Neither extreme is a universal solution.
For cold runners, a full-round section offers a favorable relationship between flow area and surface area, but it requires accurate alignment where the channel is split between mold halves. Other shapes may simplify machining or release. Autodesk discusses both cross-section choices and the influence of runner diameter on shear heating.
Review transitions, turns, cold-slug management, surface condition and ejection alongside channel size. Use material-specific simulation where warranted, then verify the proposed network in mold trials. A standard runner diameter cannot replace that review.

6. Understand the cost of the feed system

For a cold-runner example, assume four parts weigh 10 grams each and the sprue-and-runner network weighs 12 grams. Total shot mass is 52 grams; the feed network represents about 23% of that mass before any reuse. This is a hypothetical illustration, not a typical percentage for all molds.
The 12 grams should not automatically be described as landfill waste or fully recoverable raw material. Reuse depends on the resin's processing history, contamination control, permitted regrind content, appearance and product requirements. Handling, grinding and verification also have costs.
Compare tooling concepts using material consumption per accepted part, molding time, separation labor, energy, maintenance and expected downtime. For a hot-runner proposal, include startup and color-change behavior. The lowest runner weight does not necessarily produce the lowest total cost.

7. Validate the network cavity by cavity

During qualification, a controlled short-shot study can help show the filling sequence. Its setup should be defined so that holding does not conceal filling differences. Measure cavity-identified parts and review weight, appearance, dimensions and relevant performance across an appropriate process window.
If one cavity repeatedly falls behind, inspect its gate, local restrictions, venting and thermal conditions as well as the runner path. In a hot-runner tool, temperature-sensor or heater problems can produce symptoms that resemble a geometric imbalance.

Keeping cavity identity in trial data makes uneven filling and variation easier to investigate.

What buyers should request in a tooling review

Ask for the feed-system layout, proposed gate locations, cold-runner mass where applicable, and the reasoning behind the selected architecture. Confirm how balance will be evaluated, how runners will separate, what regrind is permitted and who will support maintenance. Agree on the evidence required before tool acceptance.